DEVELOPEMENT PLANS

6/18/2016 3:12:11 PM

VINACS LONG THANH

Expected Completion and Operation in June, 2026

SYSTEM CAPACITY OF VINACS LONG THANH

Capacity: 20.000 meals per day
Located in area E-09 (Area 02) at Long Thanh International Airport.
About 35 km east of Ho Chi Minh City center.
About 40 km from Tan Son Nhat International Airport.
30 km southeast of Bien Hoa city (Dong Nai).

TECHNICAL SPECIFICATIONS

NO

Technical specifications

UOM

Area

1

Site area

30.181 m2

 

2

Construction  area

5.430 m2

 

3

Floor area

15.850 m2

 

4

Floor height

floor

 

5

Green space

m2

 

Our main production and operation area

The main production area has a total area of ​​15,850 m² (2 floors above ground and 1 basements) with the entire production line, machinery and equipment for processing meals including all stages from importing goods, collecting, washing, storing, processing meals, preserving, storing goods to the shipping area.

Operation and office area

The office area has an area of ​​5,430 m² (2 floors above ground) built synchronously, integrated right with the production area.
The 2nd floor is the Operation Area of ​​VINACS Long Thanh Company with full functions including leadership block, administrative block, operation block, sales room, training room and multi-purpose hall...
The 1st floor is arranged as the staff kitchen area, changing area and uniform storage area, break room, central control...

HOT NEWS

VINACS THÀNH KÍNH TRI ÂN NHỮNG NGƯỜI ANH HÙNG ĐÃ HY SINH VÌ TỔ QUỐC

Nhân kỷ niệm 78 năm Ngày Thương binh - Liệt sĩ (27/7/1947 – 27/7/2025), sáng ngày 24/7/2025, đoàn cán bộ Công ty Cổ phần Dịch vụ Suất ăn Hàng không Việt Nam (VINACS) đã tổ chức viếng thăm hai nghĩa trang liệt sĩ thuộc xã Nội Bài

VIETNAM AIR CATERING SERVICES JSC
Noibai International Airport, Noi Bai, Hanoi, Vietnam
Hotline: + 84 (24) 3885 3885 - Email: marketing@vinacs.vn - Website: www.vinacs.vn
© Copyright 2016 VINACS. All rights reserved.