DEVELOPMENT PLANS
Ground breaking on Ferbuary 19, 2025
Completion and Operation in June, 2026
SYSTEM CAPACITY OF VINACS NOIBAI
Capacity: 20.000 meals per day
Located in area E-09 (Area 02) at Long Thanh International Airport.
About 35 km east of Ho Chi Minh City center.
About 40 km from Tan Son Nhat International Airport.
30 km southeast of Bien Hoa city (Dong Nai).
TECHNICAL SPECIFICATIONS

NO
|
Technical specifications
|
UOM
|
Area
|
1
|
Site area
|
30.181 m2
|
|
2
|
Construction area
|
5.430 m2
|
|
3
|
Floor area
|
15.850 m2
|
|
4
|
Floor height
|
floor
|
|
5
|
Green space
|
m2
|
|
Our main production and operation area
The main production area has a total area of 15,850 m² (2 floors above ground and 1 basements) with the entire production line, machinery and equipment for processing meals including all stages from importing goods, collecting, washing, storing, processing meals, preserving, storing goods to the shipping area.
Operation and office area
The office area has an area of 5,430 m² (2 floors above ground) built synchronously, integrated right with the production area.
The 2nd floor is the Operation Area of VINACS Long Thanh Company with full functions including leadership block, administrative block, operation block, sales room, training room and multi-purpose hall...
The 1st floor is arranged as the staff kitchen area, changing area and uniform storage area, break room, central control...