DEVELOPMENT PLANS
Ground breaking on May 27, 2016
Completion and Operation in May 2017
SYSTEM CAPACITY OF VINACS CAM RANH
Capacity: 10.000 meals per day
Distance from catering to Terminal: 400 m
Time to load meals from catering to the nearest aircraft: 5 minutes.
Time to load meals from catering to the farthest aircraft: 15 minutes.
Time to top-up meals for last minute order: 5-10 minutes.
TECHNICAL SPECIFICATIONS
NO.
|
Technical specifications
|
UOM
|
Area
|
1
|
Site area
|
m2
|
9.368
|
2
|
Construction area
|
m2
|
4.292
|
3
|
Floor area
|
m2
|
7.800
|
4
|
Floor height
|
floor
|
2,5
|
5
|
Green space
|
m2
|
1.946
|
Our main production and operation area
Our main production and operation area covers 6.820 sqm comprising two floors and a basement. All production lines, equipment, all working proccesses from receiving, offloading, cleaning, storage, production to loading are located at this area.
Operation and office area
Operation and office area with a space of 1.622 sqm consisting of two floors is integrated with the production area.
The Second floor is our administration and operation area: BOM, administration, operation, meeting hall, training center, meal presentation center, ... The First floor caters to canteen, changing room, lounge, control center and laboratory.