VINACS CAM RANH

6/17/2016 1:11:10 PM

DEVELOPMENT PLANS

Ground breaking on May 27, 2016

Completion and Operation in May 2017

 

SYSTEM CAPACITY OF VINACS CAM RANH

Capacity: 10.000 meals per day
Distance from catering to Terminal: 400 m
Time to load meals from catering to the nearest aircraft: 5 minutes.
Time to load meals from catering to the farthest aircraft: 15 minutes.
Time to top-up meals for last minute order: 5-10 minutes.


 
TECHNICAL SPECIFICATIONS


NO.

Technical specifications

UOM

Area

1

Site area

m2

9.368

2

Construction area

m2

4.292

3

Floor area

m2

7.800

4

Floor height

floor

2,5

5

Green space

m2

1.946

Our main production and operation area

Our main production and operation area covers 6.820 sqm comprising two floors and a basement. All production lines, equipment, all working proccesses from receiving, offloading, cleaning, storage, production to loading are located at this area.

Operation and office area

Operation and office area with a space of 1.622 sqm consisting of two floors is integrated with the production area.

The Second floor is our administration and operation area: BOM, administration, operation, meeting hall, training center, meal presentation center, ... The First floor caters to canteen, changing room, lounge, control center and laboratory.





HOT NEWS

GROUNDBREAKING CEREMONY INVESTMENT PROJECT FOR CONSTRUCTION AND BUSINESS OF IN-FLIGHT CATERING SERVICES NO. 2 AT LONG THANH INTERNATIONAL AIRPORT

On April 17, 2025, at the national key project Long Thanh International Airport, Vietnam Air Catering Services Joint Stock Company (VINACS) solemnly held the groundbreaking ceremony of "Investment project for construction and business of aviation catering services No. 2 at Long Thanh International Airport"

VIETNAM AIR CATERING SERVICES JSC
Noibai International Airport, Phu Minh, Soc Son, Hanoi, Vietnam
Hotline: + 84 (24) 3885 3885 - Email: marketing@vinacs.vn - Website: www.vinacs.vn
© Copyright 2016 VINACS. All rights reserved.